# Deployment Capability Specification ## MODIFIED Requirements ### Requirement: Docker Multi-Stage Build for Production The system SHALL package Next.js applications into production-ready Docker images using multi-stage builds with optimized Docker build pipeline integration. #### Scenario: CI/CD Docker build with image size check - **WHEN** CI/CD pipeline builds Docker image - **THEN** build completes in two stages (build + runtime) - **AND** final image size is ≤250MB - **AND** if size exceeds limit, build fails with error message - **AND** image is tagged with git commit SHA and version #### Scenario: Health check validation in CI/CD - **WHEN** Docker container starts after build - **THEN** health check endpoint responds with 200 status - **AND** CI/CD runs curl to verify health endpoint - **AND** if health check fails, deployment is halted ### Requirement: CI/CD Pipeline Configuration The system SHALL execute automated tests, build checks, and container registry operations in CI/CD pipeline. #### Scenario: Pipeline triggers on code push - **WHEN** code is pushed to main branch - **THEN** CI/CD pipeline automatically initiates - **AND** pipeline runs in <10 minutes - **AND** pipeline steps execute in correct order (lint → test → build → push) #### Scenario: Container registry push - **WHEN** tests pass and image builds successfully - **THEN** Docker image is pushed to container registry - **AND** image is tagged with version and git commit - **AND** registry confirms successful push ## ADDED Requirements ### Requirement: Environment Variable Management for Production The system SHALL securely manage environment variables for production deployment, supporting different values for development, staging, and production environments. #### Scenario: Production API URL configuration - **WHEN** application starts in production mode - **THEN** `NEXT_PUBLIC_API_URL` is set to production API endpoint - **AND** value is loaded from deployment secret management - **AND** application connects to correct API service #### Scenario: Environment variable validation - **WHEN** container starts without required environment variables - **THEN** error is logged with missing variable names - **AND** container exits with non-zero status - **AND** deployment is marked as failed ### Requirement: Production Deployment Validation The system SHALL validate successful deployment to staging and production environments with smoke tests and monitoring. #### Scenario: Staging deployment health check - **WHEN** application is deployed to staging - **THEN** smoke tests execute automatically - **AND** key user flows are validated (login, portfolio list, create) - **AND** if any test fails, rollback is initiated #### Scenario: Production deployment monitoring - **WHEN** application is deployed to production - **THEN** error tracking service begins monitoring - **AND** Core Web Vitals are monitored for 48 hours - **AND** if error rate exceeds threshold, alerting is triggered ### Requirement: Rollback & Failure Recovery The system SHALL provide automated rollback capability if deployment or monitoring detects failures. #### Scenario: Deployment rollback on test failure - **WHEN** smoke tests fail after staging deployment - **THEN** previous stable version is redeployed - **AND** team is notified of rollback via Slack/email - **AND** incident is logged for review #### Scenario: Production monitoring-based rollback - **WHEN** error rate exceeds 5% in production - **THEN** alert is sent to on-call engineer - **AND** automated rollback is offered (or manual decision) - **AND** pre-deployment version is restored if needed